BMS and EPMS for hyperscale, colocation, AI and edge data centres

Design, install, commission and maintain. One partner for the life of your data centre

ABEC takes your data centre BMS and EPMS from first design to years of maintenance after handover. A single,
system agnostic team at every stage, with the same standard on every site from London to Frankfurt to Doha.

Trusted by

Where data centre programmes lose time

BMS and EPMS
problems start at
hand-off

On a typical data centre build, the BMS and EPMS are designed by one firm, installed by another, commissioned under programme pressure and then maintained by a team that has never seen the drawings.


Every hand-off loses something: a design decision nobody wrote down, a sequence nobody tested, a workaround the night shift has to learn the hard way. The cost shows up as late handover, penalties and an estate that runs differently on every site.

A different firm at every stage, and in every region

Each new contractor starts from scratch. Different engineers, different
 standards and different graphics mean rework, retraining and sites that can’t be 
run the same way twice.

Nobody to call when the programme peaks

Skilled engineers are scarce. When your contractor can’t staff up for installation and commissioning, handover moves and late penalties land on your desk.

Knowledge lost at handover

The maintenance team inherits a system it didn’t build, with partial documentation and no one to ask. Faults take longer to find and upgrades cost more than they should.

The ABEC lifecycle

Four stages, with one team across them all

We’ve delivered the full data centre lifecycle for over 20 years in 13 countries. Whether your project is a new build, a retrofit, or ongoing maintenance, we’ve seen and done it for the biggest end users on the market.

Stage 1: Design

Get the design right before anything is ordered

Many of the problems we’re asked to fix on site were built into the design. We can collaborate on design, or review your proposed BMS and EPMS standards, points schedules and plant selections early enough to remove downstream failures.

We regularly go on to install, commission and maintain what we design, so our recommendations reflect how sites are actually built and run.

System agnostic: accredited across many of the leading BMS and EPMS platforms, so we recommend what suits the site and customer, not what we’re incentivised to sell.

Your standard, or one we help you write: we deliver to client BMS and EPMS standards, and help shape new ones so they hold up across sites and regions.

Value engineering without cutting corners: savings in hardware, 
cabling and integration that don’t compromise resilience.

Designed to repeat: lock one standard and roll it out site after site, including modular builds.

Stage 2: Install

Engineers on site when your programme needs them

The skills shortage is the biggest constraint on data centre delivery, and installation is where it bites first.

We plan resource against your programme from tender stage, and we build our own engineering capacity rather than relying on whoever happens to be available locally.

The ABEC Academy: we train experienced mechanical and electrical engineers as BMS and EPMS engineers in nine to twelve months, so our capacity grows with your programme.

Coordinated with your trades: clean interfaces with your mechanical and electrical contractors, and one project team that knows the site.

The same standard in every region: the same methods, graphics and documentation wherever you build.

Weekly progress reporting: so you always know exactly where the scope of works stands.

Stage 3: Commission

Ready on day one of integrated systems testing

Commissioning is where programme slips become visible. Every chiller, CRAH, generator and UPS has to be proven to talk to the BMS or EPMS before you can hand over.

We test early and thoroughly, so the systems we’ve built are ready when IST begins and are never the reason handover moves.

Point to point and functional testing: completed and documented before IST starts.

Full support through integrated systems testing: from engineers who installed the system.

Solutions, not problems: issues raised early, escalated quickly and met with a fix rather than a variation.

A clean handover: as-built documentation, operator training and graphics designed for whoever is on shift at 3am.

Stage 4: Maintain

The engineers who built your site keep it running

Handover isn’t the end of the job. Most of our clients move straight into maintenance with us, so the people responsible for the site already know how every point was wired and every sequence was written.

As loads, standards and technology change, we upgrade and retrofit without putting uptime at risk.

Almost all clients keep ABEC: on to maintain the systems we install.

Planned maintenance and fault response: with monthly reporting and review meetings.

Retrofit and upgrades in live environments: from a single plant replacement to a full platform migration.

We take over systems we didn’t install too: including mixed and 
legacy estates.

Your role on the build

See how ABEC works with each layer of the data centre build team.

Construction and project leaders Install and commissioning that protect your handover date A team that scales with your build, weekly reporting and a single point of accountability from first fix to IST.
Design and engineering Your standard, built the same way everywhere A system agnostic design partner who reviews early, flags gaps while they’re cheap and helps shape the standard itself.
MEP teams Engineers who understand the plant Clean interfaces with your mechanical and electrical trades, accurate points lists and people on site when IST comes round.
Operations, BMS and EPMS Maintenance from the people who built it Full documentation at handover, and engineers who already know your system when something goes wrong.
Procurement One supplier for the whole lifecycle One contract from design to maintenance, across regions, with no lock-in to a single manufacturer’s pricing.

Why data centre teams choose ABEC

What stays the same at every stage

The people, the standard and the accountability don’t change between design and maintenance. Neither does the way we work.

One team for BMS and EPMS

Cooling and power delivered together, under one contract, with one point of contact.

A specialist with no platform 
to protect

Independent advice at every stage, from first design to the tenth year of maintenance.

Backed for big programmes

Magnesium Capital’s backing gives us the balance sheet for large, multi-year, multi-site contracts, without the bureaucracy of a facilities giant.

Easy to work with

Decision makers you can reach, and problems that get escalated rather than buried.

Proof, not promises

Trusted at every stage, on sites where downtime isn’t an option

Questions data centre teams asks us

Can you join part-way through a project?

Yes. Many clients bring us in at installation or commissioning, or to take over maintenance on an operating site. We’d always rather start at design, because that’s where the most time and money can be saved.

Can you build to our own design standards?

Yes. Much of our data centre work is delivered to the client’s own BMS and EPMS standards. If you’re writing or revising a standard, we’re happy to help shape it so it holds up across sites and regions.

Which BMS and EPMS platforms do you work with?

We're system agnostic and accredited across many platforms such as Trend, Schneider Electric, Tridium, Allen-Bradley, Siemens, Distech, Cylon and more.

Do you work for the developer, the main contractor or the operator?

All three. We contract directly with data centre owners and developers, and we work as the BMS and EPMS specialist for main contractors and MEP contractors.

Can you take over a system you didn’t install?

Yes. We regularly take over maintenance and run upgrades on systems installed by other integrators, including mixed and legacy estates.

How do you resource large or multi-site programmes?

Through our own engineering teams, backed by the ABEC Academy, which trains experienced mechanical and electrical engineers as BMS and EPMS engineers. We plan resource against your programme from tender stage.

Which regions do you cover?

We have delivered projects in 13 countries across the UK, Europe and the Middle East, with offices in London, Wokingham, Dublin, Frankfurt and Doha.

What’s the difference between BMS and BAS?

They're the same thing. BMS (Building Management System) is used mostly across Europe, the Middle East and APAC; BAS (Building Automation System) most commonly used in the US.

Talk to a BMS/EPMS expert about your project

Tell us which stage your project is at and a data centre specialist will come back to you. Not a call centre or a generic sales team; someone who can talk through your scope properly.